Padma Multipurpose Bridge
Address: Approach Road, Mawa
Description
Construction cost: $3,692,000,000
Total length: 6,150 m (20,180 ft)
No. of spans: 41
Design: Truss bridge
Construction started: December 7, 2014
Constructed by: China Railway Major Bridge Engineering Company Limited
Width: 18.18 m (59.6 ft)